E. Rojas — Codelco, Chile A. Muñoz — Codelco, Chile P. Landeros Córdova — Codelco, Chile

El Teniente — the largest underground copper mine in the world, operating since 1905 — has grown deeper and faced increasingly complex geomechanical environments. This paper traces how its dynamic rock support systems evolved through five decades of rockburst events, from single‑sector strategies to an integrated design logic built on one idea: energy dissipated at the tunnel boundary equals the energy absorbed by the support plus the energy consumed by rock rupture.

UG miningdeep miningdesign methodsground supportdynamic failureblock / panel caving
Sec. 1 — Introduction№ 01
1905→ today
Continuous operation at El Teniente — the world's largest underground copper mine, deepening in stages ever since.
Sec. 2 — TC Tunnel№ 02
8.9km
Conveyor‑belt tunnel, Andes Norte project — 8.4 × 6.2 m cross‑section, feeding the inner crusher chamber. One of the mine's main infrastructure excavations, and the source of both case studies below.
Sec. 1 — Risk history№ 03
1990
Fatal rockburst accidents in the Sub6 sector force a suspension of operations there — the event that hardens rockburst control into a first‑class design problem, not an afterthought.
Sec. 1 — Since 1976Fig. 1

What "damage" has looked like, across 40 years

Two archival black-and-white photographs of rockburst damage: (a) early primary rock mass exploitation, 1980; (b) the Sub6 operation sector, 1990.

Fig. 1, Rojas, Muñoz & Landeros Córdova (2023) — (a) early primary exploitation, 1980; (b) Sub6 sector, 1990, the event that suspended operations there.

Sec. 1 — Conceptual framework, 1992–93Fig. 2

How a blast becomes a rockburst

Caving blasts the base of a rock column; gravity keeps the fracture process going upward. A seismic event is the radiated energy of a rock‑mass rupture — its character set by the geometry, geology and structure of the volume being mined.

Conceptual framework diagram: a cross-section of broken material and caveback surface leading to a rupture or seismic event, energy release, and rockburst damage at the excavation, labelled mining activities, seismic source, propagation, local response.

Fig. 2, Rojas et al. (1993), as modified and reproduced in Rojas, Muñoz & Landeros Córdova (2023).

where mining is done rupture of competent rock radiated energy travels outward felt at the excavation
Sec. 1 — Strategy№ 05

Two ways to manage the same risk

Mitigate at the source — push large‑magnitude events away from infrastructure with preconditioning (hydraulic fracturing) and by pacing disruptive mining (blasting, extraction, undercutting).

Control at the boundary — strengthen the rock support itself so that when a seismic event does arrive, observed damage stays within what the system can absorb.

Sec. 1 — Recorded events№ 06

A history read in rockbursts

  • 1976First rockburst damage recorded in the mine's exploitation systems.
  • 1990Fatal accidents in Sub6 — sector suspended.
  • 1999Experimental‑mining framework (1992–93) enters design, planning and operations.
  • 2005Mw2.5 event, Reservas Norte sector — planning impact at caving scale.
  • 2013–15Mw2.0 events in the New Mine Level Project's main tunnels.
Sec. 1 — Reservas NorteFig. 3

August 2005, Mw2.5

Two photographs of rockburst damage in the Reservas Norte sector after a magnitude 2.5 seismic event, showing collapsed tunnel walls and displaced rock and mesh.

Fig. 3, Gonzalez et al. (2005), as reproduced in Rojas, Muñoz & Landeros Córdova (2023) — damage that pushed rockburst control into sector-level planning.

Sec. 1 — New Mine Level ProjectFig. 4

2013–2015, Mw2.0

Two photographs of rockburst damage in the main infrastructure tunnels of the New Mine Level Project, one showing a large dark cavity, the other a worker inspecting rubble.

Fig. 4, Rojas et al. (2015), as reproduced in Rojas, Muñoz & Landeros Córdova (2023) — deeper ground, and a new round of learning.

Sec. 2.1 — Case ASept. 2018

When the system works as designed

A seismic event during re‑entry deforms the TC Tunnel's excavation boundary. The loaded support is fully discharged, mechanised scaling clears the face, and new support is installed. Photogrammetry then shows something the geotechnical inspection missed:

Stereo-photogrammetry scan of the TC Tunnel excavation boundary, colour-coded by depth of failure from +1.6 m (surface bulge, orange) to -3.0 m (deepest loss, blue), with the tunnel opening visible at centre.

Fig. 7, Rojas, Muñoz & Landeros Córdova (2023) — rock deterioration behind the surface reached deeper (blue) than the geotechnical estimate at the visible boundary.

Sec. 2.1 — First signFig. 5

Ground control catches it first

The yellow outlines mark where geotechnical inspection saw the excavation boundary deform, right after the September 2018 event — before anyone knew how deep the damage really went.

Two photographs of the tunnel roof with yellow dashed outlines and arrows marking deformed, loaded areas of the rock support system after a seismic event.

Fig. 5, Rojas, Muñoz & Landeros Córdova (2023) — loaded rock support system, geotechnical ground control record.

Sec. 2.1 — RehabilitationFig. 6

Scaling back to find out how far it went

Mechanised scaling during rehabilitation kept exposing more fractured rock than the geotechnical and stress estimates predicted — the gap that sent the team to photogrammetry.

Three sequential photographs of mechanised scaling equipment removing fractured rock from a tunnel face during rehabilitation, with visible dust and debris.

Fig. 6, Rojas, Muñoz & Landeros Córdova (2023) — operational ground control records.

Sec. 2.2 — Case BSept. 2020

When capacity is exceeded

A severe rockburst hits the same tunnel with a much larger depth of failure. Boundary fracturing looks similar to a normal deformation zone — the difference only shows up at depth.

Two photographs: (a) mesh and bolt plates on the tunnel roof showing evidence of loading; (b) heavy rubble and deformation around the September 2020 rockburst.

Fig. 8, Rojas, Muñoz & Landeros Córdova (2023) — (a) roof damage with evidence of loading; (b) deformation around the rockburst.

>100cm
wall displacement
>16m²
bulged zone, base
>1m
bulge curve height

Where anchors held, blocks mechanically interlocked with intact elements — rock and grout fracturing dissipated energy the support system never had to absorb alone.

Sec. 2.2 — Rehabilitation sequenceFig. 9

Six frames, one recovery

Zones with deformed support (top row) worked through the same mechanised sequence as the rest of the tunnel — scale, assess, re-support — despite carrying more damage than their neighbours.

Six photographs in two rows showing the rockburst rehabilitation process step by step, from heavily damaged tunnel faces to cleared and re-supported ground.

Fig. 9, Castro & Bahamondes (2020), as reproduced in Rojas, Muñoz & Landeros Córdova (2023).

Sec. 3 — Measured, not estimatedFig. 13

Where the >100 cm came from

The bulged mesh above held fractured rock displaced more than a metre outward before the central bolts broke — load redistributed to the surrounding elements instead of letting go.

Two photographs showing heavily bulged and displaced mesh support with visible rock fragments contained behind it, and workers inspecting the deformation.

Fig. 13, Rojas, Muñoz & Landeros Córdova (2023) — photographic evidence of rock mass displacement contained by the support elements.

Sec. 2.2 — Where anchors heldFig. 10

Interlocking, up close

Rebars stay fully grouted while the blocks around them interlock mechanically — visible proof that rock and grout fracturing were doing some of the energy dissipation the support never had to.

Two close-up photographs of fractured rock around a tunnel excavation, annotated with measurement lines, showing mechanical interlocking of blocks with grouted rebars visible inside.

Fig. 10, Muñoz (2021), as reproduced in Rojas, Muñoz & Landeros Córdova (2023).

Sec. 3 — Conceptual behaviourFig. 11

Reinforcement and retention, working as one system

Bolts reinforce the rock closest to the excavation and anchor the mesh; a second, deeper layer of cables can anchor further into undisturbed ground. Loads must transfer, in order, without any element failing before the one behind it.

Diagram of rock support elements: full grouting, rebars, mesh, and plate and nuts, arranged in layers from the excavation boundary into undamaged rock, with a stress-distribution inset.

Fig. 11, Rojas, Muñoz & Landeros Córdova (2023) — diagram of rock support elements and stress distribution in the surrounding area.

Mesh → Plate → Nut → Rebar
required transfer order — none may fail before the rebar
Sec. 3 — Load transferFig. 12

The same bolt, before and after a dynamic load

Cable and rebar both hold the excavation boundary in place. Once loaded, the boundary displaces toward the tunnel, and the mesh — now carrying more tensile stress — has to pass the extra load on to whichever reinforcement elements haven't failed yet.

Schematic diagram comparing a tunnel cross-section before and after dynamic loading, showing how cables, rebars and mesh redistribute stress as the excavation boundary displaces.

Fig. 12, Rojas, Muñoz & Landeros Córdova (2023) — schematic representation of rebars and cable, before and after being loaded.

Sec. 3 — Mechanism№ 10

Distributing excess load to neighbouring elements creates an arching effect — it stabilises fractured rock instead of letting it collapse.

— after Muñoz (2019), on retention‑system behaviour

Sec. 5 — Conclusions№ 11

Energy at the boundary = energy dissipated by the support + energy consumed in rock rupture.

The paper's central equation — and the reason retention capacity, steel toughness and failure‑depth estimates all have to be sized together, not separately.

1980s№ 12

Shotcrete becomes standard

External elements — plates and nuts — plus shotcrete application turn the bolt‑mesh‑shotcrete system into the productive‑level baseline.

1990s№ 13

Chainlink replaces welded mesh

Higher retention capacity, and better load transfer from mesh to external elements and on to the rockbolts (Rojas 1993).

2000s№ 14

Friction bolts at the face

Block stabilisation at the working face, better confinement‑wall anchoring, and the first operational QA/QC guidelines (Celis et al. 2006).

Early 2010s№ 15

Layered systems, dynamic testing

Two meshes with dedicated anchors per layer allow progressive load transfer; dynamic testing and better steels refine plate, nut and bar geometry (Muñoz et al. 2014).

Mid‑2010s№ 16

Higher‑capacity mesh, mechanised install

Mesh with greater energy‑dissipation capacity; mechanised installation becomes central to rockburst risk control, including face‑mesh for blast‑stage worker safety.

Recent№ 17

Micro‑alloyed steel bars

Higher system capacity without changing bar geometry or installation practice — capacity gained "for free" at the install stage.

Sec. 4 — Production vs. seismicity, 1982–2020Fig. 14

More tonnes, and a support system that kept pace

Rockbursts didn't fall as production climbed — but each annotation marks the year a new support element entered the design, plotted directly against forty years of measured production and seismicity.

Chart titled Rockburst versus Production, 1982 to 2020, with bars for annual ore production by sector and a line for number of rockbursts per year, annotated with the year each rock support innovation was introduced.

Fig. 14, modified and updated from Muñoz et al. (2016), as reproduced in Rojas, Muñoz & Landeros Córdova (2023).

Sec. 5 — Conclusions№ 19

The support system is the last link

Every prior stage — hazard mitigation, preconditioning, mine sequencing — exists to keep events small and far from infrastructure. If the support system ends up loaded, it means those earlier stages weren't enough on their own. Its job from there is narrow and specific: reduce rock rupture, limit displacement, and keep the tunnel functional — by design allowing displacement while consuming energy as it does.

Mesh
retention — needs strength
Rebar
reinforcement — needs toughness
Cable
deep anchor — added by estimated failure depth

Source paper

Rojas, E, Muñoz, A & Landeros Córdova, P 2023, 'Evolution of dynamic rock support systems at the El Teniente mine', in J Wesseloo (ed.), Ground Support 2023, Australian Centre for Geomechanics, Perth, pp. 129–140, https://doi.org/10.36487/ACG_repo/2325_08

This page condenses the paper's argument into a scannable layout and reproduces all fourteen of its figures directly from the source — it is not a substitute for the original text and full reference list, which include prior internal Codelco reports and related ACG proceedings on Andes Norte and rockburst risk management.

Scroll al inicio